How to regularly maintain the 400 tons hydraulic jack cylinder and electric oil pump?

2020-02-01 18:06:48

How to regularly maintain the 400 tons hydraulic jack cylinder and electric oil pump?
Hydraulic jacks, as industrial maintenance and installation tools that are widely used in the industry, differ from the mechanical tools used in our homes, especially in the way they are maintained.
The 400 tons hydraulic jack cylinder and electric oil pump produced by Zhengzhou Gaode Equipment Co., Ltd have undergone strict quality control before leaving the factory, so they can display their good performance when they reach the unit. Even so, we still have to spend a section to explain its post-maintenance. Because the hydraulic jack cylinder are placed for a long time, the internal parts will produce some minor changes. These changes are what we usually need to pay attention to. Don't wait until you use it to remember it.
 


For the maintenance of the 400 ton hydraulic jack, we mainly consider the following aspects:
1. Replacement of hydraulic oil. After a long period of time, the long-term contact of the hydraulic oil with the space produces a chemical change (deterioration). If we do not replace it, the inferior oil will damage the hydraulic jack cylinder and electric oil pump. The viscous oil will pinch the small tubing and stick to the internal tubing, preventing normal oil passages.
2. Inspection of the joint part. Because during the construction process, if the high-pressure joint is inadvertently damaged, and exposed to the air for a long time, it will easily lead to rust and cracking of the joint. Such joints need to be replaced to avoid oil leakage during construction.
3. Tubing. Check the bending condition of the oil pipe during actual storage. If the oil pipe is bent, squeezed, damaged, etc., it needs to be replaced.
4. Replace the seal ring of hydraulic jack cylinder. After the sealing ring is in contact with air and oil, it will be stored for a long time, resulting in aging of the sealing ring. Such a seal loses its sealing effect and needs to be replaced. The flying imported sealing ring has a longer storage time and better sealing oxidation resistance. Even so, after the 400 tons hydraulic jack cylinder has been used for a few years, it is still necessary to inspect it and replace the unqualified seal.
5. Maintenance of the pumping station. Because the 400 tons jack and the pumping station work together, the two are indispensable, so it is necessary to check the pumping station.


The core of the above inspection is to see if there is any oil leakage in the parts, which is the focus of our inspection in the later maintenance.
The above maintenance work has a great effect on extending the service life of the hydraulic jack and reducing the problems in the construction. Zhengzhou Gaode Equipment Co., Ltd will continue to provide customers with high quality 400 tons hydraulic jack cylinder and electric oil pump, as well as provide you with the first time after-sales service, welcome your call to visit!

 

Inquiry >>
Products you need :
Your name :
Your tel :
* Your mail :
Your company :
Your country :
* Inquiry :
 
COPYRIGHT © GAODE EQUIPMENT CO.,LTD. Site Index Product IndexPrivacy Policy Technical Support:coverweb