Quotation
PRODUCT CATEGORIES
Hydroseeding Equipment
Grouting Mixing Plant
Grouting Mixer and Agitator
Grouting Pump
Refractory Gunite/Shotcrete/Mixer
Shotcrete Machine
Peristaltic Pump
Anchor Equipment and Tools
Foam Concrete Machine
Filter Press
Slurry Pump
Drilling Rig
Plaster Pump
Road Marking Machine
Concrete Pump
Hydraulic Pump Station
DTH Drill Tools
Customized Service
Send Inquiry

XL-50 Jet Grouting Drilling Rig construction inspection content

2015-04-02 09:05:00

First, the pre-construction inspection before construction raw materials, machinery and equipment and jet technology and other checks, mainly in the following aspects:
Quality certification and re-inspection report ① raw materials (including cement, admixture, accelerator, suspensions and other additives), and mixing the identification results of water;
② slurry mix is ​​appropriate engineering soil conditions;
③ mechanical equipment is normal, pre-construction to deal with high pressure jet grouting equipment, geological drilling rig, high-pressure mud pumps, water pumps and other machines for the test run, while ensuring that the drill pipe (especially multi-drill), drill and inducer of obstruction;
④ Check the injection process is suitable geological conditions in the pre-construction process should also make spray test, test spray in the original pile position spray test, test spray pile hole number not less than two-hole, if necessary, adjust the injection process parameters.
⑤ underground obstacles before construction should also be unified case investigation to ensure that drilling and injection to meet the design requirements.
⑥ pile pre-construction inspection, pressure gauges, flow meter accuracy and sensitivity.
Second, the construction of the check on the construction of the focus on checking the contents are:
① drill pipe and drill positioning verticality;
② cement slurry mix and materials weighing;
③ rig speed, heavy drilling speed, improve drilling speed and rotational speed;
④ jet grouting when spraying (water, jet) pressure grouting speed and grouting;
⑤ holes oozing slurry condition at;
⑥ nozzle sinking lap length and grouting pipe segment elevation during lifting;
⑦ construction records are complete, the construction should be a pressure and flow data recorded at each change to enhance the soil at the junction of 1m or records. 

Inquiry >>
Products you need :
Your name :
Your tel :
* Your mail :
Your company :
Your country :
* Inquiry :
 
COPYRIGHT © GAODE EQUIPMENT CO.,LTD. Site Index Product IndexPrivacy Policy Technical Support:coverweb